
17.04000
PVC
Performance standard Cooling principle Peltier cooling Number of gas paths 1 Number of Peltier elements 1 Integrated condensate pump option Integrated condensate monitoring option Operation Gas flow per gas path* max. 250 Nl/hr Gas inlet temperature* max. 140 °C; SS heat exchanger: max. 180 °C Gas inlet dew point* max. 80°C Gas outlet dew point 5 °C (factory default); adjustable from 0,5 °C to 7,5 °C Dew point stability (for constant inlet conditions) ±0,1 K Ambient temperature 5° to 45 °C Cooling capacity total max. 15 W Operating pressure with condensate pump 0,2 to 2,2 bara Max. operating pressure without condensate pump 4,0 bara; SS heat exchanger: max. 19 bara Ready for operation < 30 min Pressure drop at max. flow rate 3 mbar Construction Dimensions over all (W x H x D) 244 x 308 x 211 mm Installation wall mounting Mounting position horizontal Weight** approx. 6,5 kg Housing / Colour stainless steel / natural Gas wetted materials (depending on configuration) PVDF, SS316Ti, FFKM
Price, availability, and delivery times will be confirmed in your quote.
| Manufacturer | JCT |
|---|---|
| Part number | JCM-300 |
Serving over 110 countries
Provided by the manufacturer
Assistance and replacement parts
Protection for your components
Search by part number, manufacturer, or description.
What you need to know about purchasing, delivery times, and JAES supply warranties.